grades
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
grades [2007/10/31 16:40] – jonathan | grades [2007/12/11 00:06] (current) – jonathan | ||
---|---|---|---|
Line 8: | Line 8: | ||
* 10% - Assignment 1 (Analysis of the problem domain, Jackson problem context diagrams and UML diagrams). Handed out Sep 17. Due: Sep. 25th. Grades handed out Oct 11. | * 10% - Assignment 1 (Analysis of the problem domain, Jackson problem context diagrams and UML diagrams). Handed out Sep 17. Due: Sep. 25th. Grades handed out Oct 11. | ||
- | * 10% - Assignment 2 (User Manual as Requirements). Handed out Sep. 19, due: Oct. 11. | + | * 10% - Assignment 2 (User Manual as Requirements). Handed out Sep. 19, due: Oct. 11. Handed back Nov 8. |
- | * 15% - Assignment 3 (Mission & Safety Critical specifications via Spin and temporal logic requirements). Handed out October 30th. Due Monday | + | * 15% - Assignment 3 (Mission & Safety Critical specifications via Spin and temporal logic requirements). Handed out October 30th. Due Monday |
* 25% - **Test Nov. 15th**. | * 25% - **Test Nov. 15th**. | ||
- | * Lecture | + | * All lecture |
- | * All the required readings ((note that you will not be asked any questions on the B-method). | + | * You will not be asked any questions on the B-method |
+ | * You will not be asked questions on Perl/CGI programming - this material was needed for understanding how to specify requirements for web based applications as in Project 2. | ||
+ | * You will not be asked questions on Fit tables. This was to show how a requirememts document can be made testable. | ||
+ | * All the required readings. | ||
* You will be tested on the material treated by Assignments 1, 2 and 3. | * You will be tested on the material treated by Assignments 1, 2 and 3. | ||
- | * 5% - Assignment | + | * 5% - Assignment |
- | * 15% - Project 1 (Continuation of User manual as a requirement document from assignment 1, and implementation of the requirements). Handed out: Oct 12. Due date: Monday | + | * 15% - Project 1 (Continuation of User manual as a requirement document from assignment 1, and implementation of the requirements). Handed out: Oct 12. Due date: Monday |
- | * 20% - Project 2 (Requirements elicitation & analysis and documentation). This project will commence towards the end of October. | + | * 20% - Project 2 (Requirements elicitation & analysis and documentation). This project will commence towards the end of October. Handed out October 30th. Due: Monday December 10th, noon. |
You can view your marks | You can view your marks |
grades.1193848843.txt.gz · Last modified: 2007/10/31 16:40 by jonathan