User Tools

Site Tools


important_dates

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
important_dates [2007/08/31 19:47] jonathanimportant_dates [2007/10/31 16:53] (current) jonathan
Line 1: Line 1:
 ====== Important Dates ====== ====== Important Dates ======
 +
 +See [[grades|update to due dates]] for assignments and projects.
 +
 +
 H = holyday, no class H = holyday, no class
 ^September 2007^^^^^^^ ^September 2007^^^^^^^
Line 9: Line 13:
 |30  ||||||| |30  |||||||
  
- 5% - Assignment 1 (Jackson problem context diagram/UML diagrams). To be handed out: Sep 11. Due: Sep 18+September Dates: 
-  * 5% - Assignment 2 (User manual as a requirement document). To be handed out: Sep 25. Due: Oct. 11.+ 
 +  10% - Assignment 1 (Use Case and Context/Problem Diagrams) handed out September 17. Due: Sep 25 at noon
 +  * 10% - Assignment 2 (User manual as a requirement document). Handed out: Sep 19. Due: Oct. 11 at noon.
  
  
important_dates.1188589641.txt.gz · Last modified: 2007/08/31 19:47 by jonathan

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki