User Tools

Site Tools


important_dates

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
important_dates [2007/09/19 23:09] jonathanimportant_dates [2007/10/31 16:53] (current) jonathan
Line 1: Line 1:
 ====== Important Dates ====== ====== Important Dates ======
 +
 +See [[grades|update to due dates]] for assignments and projects.
 +
 +
 H = holyday, no class H = holyday, no class
 ^September 2007^^^^^^^ ^September 2007^^^^^^^
Line 11: Line 15:
 September Dates: September Dates:
  
-  * 5% - Assignment 1 handed out September 17. Due: Sep 25 at noon.+  * 10% - Assignment 1 (Use Case and Context/Problem Diagrams) handed out September 17. Due: Sep 25 at noon.
   * 10% - Assignment 2 (User manual as a requirement document). Handed out: Sep 19. Due: Oct. 11 at noon.   * 10% - Assignment 2 (User manual as a requirement document). Handed out: Sep 19. Due: Oct. 11 at noon.
  
important_dates.1190243389.txt.gz · Last modified: 2007/09/19 23:09 by jonathan

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki