User Tools

Site Tools


start

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
start [2007/08/28 19:28] jonathanstart [2007/09/30 03:19] (current) jonathan
Line 10: Line 10:
  
 <hi>Participants in the course</hi>: please login (see below) to see the full array of resources for this course. <hi>Participants in the course</hi>: please login (see below) to see the full array of resources for this course.
 +
  
  
Line 16: Line 17:
  
   * Lecture Times: Tuesdays and Thursdays 4.00pm-5.30pm in CB 129   * Lecture Times: Tuesdays and Thursdays 4.00pm-5.30pm in CB 129
 +  * Office hours: Tuesdays and Thursdays 5.30pm-6.15pm
  
  
Line 23: Line 25:
  
  
-=====Recommended Textbooks===== 
  
-  *Highly Recommended (but not required):  + 
-    *Michael Jackson, Problem Frames, Pearson, 2001. + 
-  *Recommended: +=====Recommended Textbooks===== 
-    *Kotonya & Sommerville, Requirements Engineering, Wiley, 1998 +  *[J] Michael Jackson, Problem Frames, Pearson, 2001. 
-    *Karl Wiegers, More about Software Requirements, Microsoft Press, 2006 +  *[KS] Kotonya & Sommerville, Requirements Engineering, Wiley, 1998 
-    *Martin Fowler, UML Distilled, Addison-Wesley, 2003 +  *[W] Karl Wiegers, More about Software Requirements, Microsoft Press, 2006 
-    *[[http://www.volere.co.uk/books.htm|Other books on Requirements]] +  *[F] Martin Fowler, UML Distilled, Addison-Wesley, 2003 
 +  *[[http://www.volere.co.uk/books.htm|Other books on Requirements]] 
  
 A request has been made to the Steacie Library to have the above volumes on two hour reserve. A request has been made to the Steacie Library to have the above volumes on two hour reserve.
 +
  
  
Line 43: Line 46:
 We hope to have two guest lecturers on the following topics: We hope to have two guest lecturers on the following topics:
  
-  * [[http://fit.c2.com/|Fit Table]] Descriptions for information system requirements: September 27th, October 2nd and October 4th.+  * [[http://fit.c2.com/|Fit Table]] Descriptions for information system requirements: October 2nd and October 4th.
   * Parnas Table Descriptions for safety critical system requirements (possibly some time in November).   * Parnas Table Descriptions for safety critical system requirements (possibly some time in November).
  
  
start.1188329329.txt.gz · Last modified: 2007/08/28 19:28 by jonathan

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki