User Tools

Site Tools


start

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
start [2007/09/05 17:51] jonathanstart [2007/09/30 03:19] (current) jonathan
Line 36: Line 36:
  
 A request has been made to the Steacie Library to have the above volumes on two hour reserve. A request has been made to the Steacie Library to have the above volumes on two hour reserve.
 +
  
  
Line 45: Line 46:
 We hope to have two guest lecturers on the following topics: We hope to have two guest lecturers on the following topics:
  
-  * [[http://fit.c2.com/|Fit Table]] Descriptions for information system requirements: September 27th, October 2nd and October 4th.+  * [[http://fit.c2.com/|Fit Table]] Descriptions for information system requirements: October 2nd and October 4th.
   * Parnas Table Descriptions for safety critical system requirements (possibly some time in November).   * Parnas Table Descriptions for safety critical system requirements (possibly some time in November).
  
  
start.1189014695.txt.gz · Last modified: by jonathan