course_outline
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
course_outline [2009/03/12 17:03] – jonathan | course_outline [2009/03/12 17:10] (current) – jonathan | ||
---|---|---|---|
Line 8: | Line 8: | ||
* Requirements Traceability. How do you check that the final product satisfies the User Requirements? | * Requirements Traceability. How do you check that the final product satisfies the User Requirements? | ||
* Triage in Requirements Engineering. How to deal with changing requirements and " | * Triage in Requirements Engineering. How to deal with changing requirements and " | ||
- | * The difference between doing Requirements for Safety Critical Systems such as nuclear reactors or medical equipment and other systems. The use of mathematical models for Requirements | + | * The difference between doing Requirements for Safety Critical Systems such as nuclear reactors or medical equipment and other systems. The use of mathematical models for for writing requirements and specifications |
- | ==== Topics covered | + | ==== Weekly summary |
Line 54: | Line 54: | ||
* Week 9, October 27: Textbook Appendix - Example user requirements. | * Week 9, October 27: Textbook Appendix - Example user requirements. | ||
+ | |||
+ | * Week 10. Parnas Tables for documenting requirements of safety critical systems. See I slides. | ||
+ | |||
* CUPE strike starts early November. | * CUPE strike starts early November. | ||
+ | |||
+ | * Classes resume on Tuesday, February 3, 2009. | ||
+ | |||
+ | * Week of Feb 3: Requirements using Event-B and Spin modelling. | ||
+ | |||
+ | * Week of Feb 9. Requirements for the bridge controller in Event-B and Spin. | ||
+ | |||
+ | * Week of Feb 16th. Discussion of User Requirements Documents, System Specification Documents and Requirements Traceability in the light of Phase 2 of the project. | ||
course_outline.1236877380.txt.gz · Last modified: 2009/03/12 17:03 by jonathan