course_outline
Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| course_outline [2009/03/12 17:04] – jonathan | course_outline [2009/03/12 17:10] (current) – jonathan | ||
|---|---|---|---|
| Line 8: | Line 8: | ||
| * Requirements Traceability. How do you check that the final product satisfies the User Requirements? | * Requirements Traceability. How do you check that the final product satisfies the User Requirements? | ||
| * Triage in Requirements Engineering. How to deal with changing requirements and " | * Triage in Requirements Engineering. How to deal with changing requirements and " | ||
| - | * The difference between doing Requirements for Safety Critical Systems such as nuclear reactors or medical equipment and other systems. The use of mathematical models for Requirements | + | * The difference between doing Requirements for Safety Critical Systems such as nuclear reactors or medical equipment and other systems. The use of mathematical models for for writing requirements and specifications |
| - | ==== Topics covered | + | ==== Weekly summary |
| Line 59: | Line 59: | ||
| * CUPE strike starts early November. | * CUPE strike starts early November. | ||
| + | |||
| + | * Classes resume on Tuesday, February 3, 2009. | ||
| + | |||
| + | * Week of Feb 3: Requirements using Event-B and Spin modelling. | ||
| + | |||
| + | * Week of Feb 9. Requirements for the bridge controller in Event-B and Spin. | ||
| + | |||
| + | * Week of Feb 16th. Discussion of User Requirements Documents, System Specification Documents and Requirements Traceability in the light of Phase 2 of the project. | ||
course_outline.1236877457.txt.gz · Last modified: by jonathan
