User Tools

Site Tools


announcements

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
announcements [2009/02/04 16:21] aeckfordannouncements [2009/02/04 16:22] (current) aeckford
Line 7: Line 7:
 The project and survey paper are both due on Feb. 19.  Let me know if you need an extension. The project and survey paper are both due on Feb. 19.  Let me know if you need an extension.
  
-Test 2 will be held in class on Feb. 18, with a take-home part.  To help you practice for Test 2, a [[probsets|problem set]] has been posted.+Test 2 will be held in class on Feb. 18, with a take-home part (same format as Test 1).  To help you practice for Test 2, a [[probsets|problem set]] has been posted.
  
 As a reminder, Test 2 is now optional.  If you write test 2, you will be graded under the original marking scheme; otherwise, your grade will be calculated as follows: Test 1, 33.3%; survey paper, 33.3%; and project, 33.3%. As a reminder, Test 2 is now optional.  If you write test 2, you will be graded under the original marking scheme; otherwise, your grade will be calculated as follows: Test 1, 33.3%; survey paper, 33.3%; and project, 33.3%.
 +
 +If you wish to write Test 2, you must let me know in advance.  If you do not let me know, I will assume that you do not want to write Test 2, and you will therefore be graded under the new marking scheme.
  
 ---- ----
announcements.1233764461.txt.gz · Last modified: 2009/02/04 16:21 by aeckford

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki