assessment
Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| assessment [2008/09/02 16:03] – aeckford | assessment [2008/10/28 21:09] (current) – aeckford | ||
|---|---|---|---|
| Line 13: | Line 13: | ||
| ===== Tests ===== | ===== Tests ===== | ||
| - | Due to the technical nature of the material in this course, | + | Due to the technical nature of the material in this course, tests will be given to verify the students' |
| ===== Survey Paper ===== | ===== Survey Paper ===== | ||
| - | Students will submit paper surveying recent research on a topic of their choice. Students are required to submit a proposal several weeks before the paper' | + | Students will submit |
| + | |||
| + | The survey paper grade is broken down as follows: | ||
| + | |||
| + | * Technical quality: 50% | ||
| + | * Selection of references: 40% | ||
| + | * Writing quality: 10% | ||
| ===== Course Project ===== | ===== Course Project ===== | ||
| - | Students will be required to implement a contemporary channel coding system and verify its operation in computer simulation, as assigned by the instructor. | + | Students will be required to implement a contemporary channel coding system and verify its operation in computer simulation, as assigned by the instructor. |
| + | |||
| + | The project grade is broken down as follows: | ||
| + | |||
| + | * Technical quality and correctness: | ||
| + | * Quality of report and plots: 10% | ||
| + | * Quality of source code (readability, | ||
| + | |||
| + | The project description may be found {{: | ||
assessment.1220371438.txt.gz · Last modified: by aeckford
