User Tools

Site Tools


calendar

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
calendar [2009/07/03 18:33] lancalendar [2009/07/30 21:23] (current) lan
Line 6: Line 6:
 |   Jun 22  |   √  |  B  |  Code Translation  | |   Jun 22  |   √  |  B  |  Code Translation  |
 |   Jun 29  |   √  |  C  |  Translating Utility Classes and Objects | |   Jun 29  |   √  |  C  |  Translating Utility Classes and Objects |
-|   Jul 6  |    √  |  D  |  Machine Language |+|   Jul 6  |    √  |  D  |  Machine Language  |
 |   Jul 13  |  √    K  |  Test #1  | |   Jul 13  |  √    K  |  Test #1  |
 |   Jul 20  |   √  |  L  |  Introduction to Hardware  | |   Jul 20  |   √  |  L  |  Introduction to Hardware  |
Line 19: Line 19:
   * The Drop Deadline is Fri Jul 31.    * The Drop Deadline is Fri Jul 31. 
   * Test #2 will be held during the exam period (Aug 24 - Aug 31).   * Test #2 will be held during the exam period (Aug 24 - Aug 31).
 +  * As posted on York's RO website, Test #2 will be on Sat, Aug 29 from 7-10pm at VH-3006.
calendar.1246645998.txt.gz · Last modified: 2009/07/03 18:33 by lan

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki