calendar
This is an old revision of the document!
Calendar
WEEK OF | Thu | Lab | Topic | |
---|---|---|---|---|
Jun 08 | ✔ | ✘ | Overview of the course | |
Jun 15 | ✔ | ✘ | Performance and Data Translation | |
Jun 22 | ✔ | A | Code Translation | |
Jun 29 | ✔ | B | Translating Utility Classes | |
Jul 6 | ✔ | C | Translating Objects | |
Jul 13 | ✔ | D | Machine Language + Floating-Point | |
Jul 20 | Test #1 in VH-D | ✔ | Make-up Labs | Introduction to Hardware |
Jul 27 | ✔ | K | The CPU Datapath | |
Aug 3 | ✔ | L | The Single-Cycle Control | |
Aug 10 | ✔ | M | Pipelining | |
Aug 17 | ✔ | N | Caches |
Important Dates
- Test #1 is Mon Apr 13 in VH-D.
- The Drop Deadline is Fri Jul 31.
- Test #2 will be held during the exam period (Aug 24 - Aug 31).
calendar.1243969020.txt.gz · Last modified: 2009/06/02 18:57 by lan