User Tools

Site Tools


calendar

This is an old revision of the document!


Calendar

WEEK OF Mon Wed Lab Topic
Mar 02 Overview of the course
Mar 09 Performance and Data Translation
Mar 16 A Code Translation
Mar 23 B Translating Utilities
Mar 30 C Machine code and linking
Apr 06 D Malware and the FPU
Apr 13 Test#1 Make-up Introduction to Hardware
Apr 20 K The CPU Datapath
Apr 27 L The Single-Cycle Control
May 04 M Pipelining
May 11 N Caches
May 18 Make-up No lecture on Monday

Important Dates

  • Test#1 is Mon Apr 13.
  • The Drop Deadline is Wed Apr 22.
  • Test#2 will be held during the exam period (May 22 - Jun 2).
calendar.1237852799.txt.gz · Last modified: 2009/03/23 23:59 by roumani

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki