schedule
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
schedule [2009/04/22 02:07] – aeckford | schedule [2009/05/18 19:14] (current) – aeckford | ||
---|---|---|---|
Line 11: | Line 11: | ||
| Mar. 23 | Physical layer: The mobile radio environment II | < | | Mar. 23 | Physical layer: The mobile radio environment II | < | ||
| Apr. 6 | Data link layer: Access control and multiple access | | Apr. 6 | Data link layer: Access control and multiple access | ||
- | | Apr. 13 | Network layer: Mobile routing | + | | Apr. 13 | Network layer: Mobile routing |
- | | Apr. 20 | Network | + | | Apr. 20 | Transport |
- | | Apr. 27 | Transport layer: Mobile flow control | + | | Apr. 27 | Applications: Cellular systems |
- | | May 4 | Practical protocols: Bluetooth, WiFi | <hi>Quiz 2: May 7</hi> | | | + | | May 4 | Applications: Bluetooth, WiFi | <del>Quiz 2: May 7</del> | | |
- | | May 11 | Applications: | + | | May 11 | Applications: |
| May 18 | Applications: | | May 18 | Applications: | ||
Line 25: | Line 25: | ||
* Lab 1 due on < | * Lab 1 due on < | ||
* Lab 2 due on < | * Lab 2 due on < | ||
- | * Remaining lab due dates TBA. | + | * Lab 3 due on < |
+ | * Lab 4 due on < | ||
== Survey or Tutorial Paper == | == Survey or Tutorial Paper == |
schedule.1240366028.txt.gz · Last modified: 2009/04/22 02:07 by aeckford