schedule
Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| schedule [2009/04/30 21:20] – aeckford | schedule [2009/05/18 19:14] (current) – aeckford | ||
|---|---|---|---|
| Line 12: | Line 12: | ||
| | Apr. 6 | Data link layer: Access control and multiple access | | Apr. 6 | Data link layer: Access control and multiple access | ||
| | Apr. 13 | Network layer: Mobile routing | | Apr. 13 | Network layer: Mobile routing | ||
| - | | Apr. 20 | Transport layer: Mobile flow control | + | | Apr. 20 | Transport layer: Mobile flow control |
| - | | Apr. 27 | Applications: | + | | Apr. 27 | Applications: |
| | May 4 | Applications: | | May 4 | Applications: | ||
| | May 11 | Applications: | | May 11 | Applications: | ||
| Line 25: | Line 25: | ||
| * Lab 1 due on < | * Lab 1 due on < | ||
| * Lab 2 due on < | * Lab 2 due on < | ||
| - | * Remaining lab due dates TBA. | + | * Lab 3 due on < |
| + | * Lab 4 due on < | ||
| == Survey or Tutorial Paper == | == Survey or Tutorial Paper == | ||
schedule.1241126454.txt.gz · Last modified: by aeckford
