Project

Phase 1

Phase 1 of the project has been released (Sep 16, 2009).

  • For the description see: SVN:Project:CSE4312-F09-Project.pdf.
  • Both a printed and electronic copy are required by noon of the due date (see above document for detail).
  • You may work on your own or in groups of at most two. Submit only one report. Put your names, Prism logins, and signatures on the report.
  • By noon of Monday October 5th, each team must place in the course drop box:
    • the names of the members of the team for Phase 1
    • a preliminary but precise mathematical description of how your team will calculate ROIs. This information must ultimately appear in your Phase 1 submission. See the sample documents for examples of precise descriptions of this kind.
  • Although this prliminary document is not graded, failure to submit it by the due date, will result in a letter grade reduction of your Phase 1 grade.

Phase 2

Phase 2 of the project has been released.

  • For the description see: SVN:Project:CSE4312-F09-Project.pdf (version 0.31)
  • Both a printed and electronic copy are required by noon of the due date (see above document for detail).
  • You may work on your own or in groups of at most two. Submit only one report. Put your names, Prism logins, and signatures on the report.
  • Electronic submission: submit -l 4312 p2 4312-p2.pdf 4312-p2.doc (i.e. you must submit a *.doc – or whatever your original source is – as well as a *.pdf of your document).

Phase 3

Due date: Dec 7

Meet with TA:

Thu Dec 17: 4-10pm Dec 18: 9am to 12am and 2-6pm