project:start
This is an old revision of the document!
Project
Phase 1
Phase 1 of the project has been released (Sep 16, 2009).
- For the description see:
SVN:Project:CSE4312-F09-Project.pdf
. - Both a printed and electronic copy are required by noon of the due date (see above document for detail).
- You may work on your own or in groups of at most two. Submit only one report. Put your names, Prism logins, and signatures on the report.
- By noon of Monday October 5th, each team must place in the course drop box:
- the names of the members of the team for Phase 1
- a preliminary but precise mathematical description of how your team will calculate ROIs. This information must ultimately appear in your Phase 1 submission. See the sample documents for examples of precise descriptions of this kind.
- Although this prliminary document is not graded, failure to submit it by the due date, will result in a letter grade reduction of your Phase 1 grade.
Phase 2
Phase 2 of the project has been released.
- For the description see:
SVN:Project:CSE4312-F09-Project.pdf
(version 0.31) - Both a printed and electronic copy are required by noon of the due date (see above document for detail).
- You may work on your own or in groups of at most two. Submit only one report. Put your names, Prism logins, and signatures on the report.
- Electronic submission:
submit -l 4312 p2 4312-p2.pdf 4312-p2.doc
(i.e. you must submit a *.doc – or whatever your original source is – as well as a *.pdf of your document).
Phase 3
Due date: Dec 7
Meet with TA in the SEL: Thu Dec 8-9
project/start.1259103394.txt.gz · Last modified: 2009/11/24 22:56 by jonathan