User Tools

Site Tools


calendar

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
calendar [2010/02/13 17:48] roumanicalendar [2011/04/03 13:58] (current) roumani
Line 1: Line 1:
 ====== Calendar ====== ====== Calendar ======
  
-[[http://www.cse.yorku.ca/~roumani/course/2021/lecture|Lecture Notes]]+[[http://www.cse.yorku.ca/~roumani/course/2021/res|Lecture Notes and Programs Developed in Class]]
  
-^  WEEK OF  ^  Lab  ^  Topic  ^   +^  WEEK OF  ^  Lab  ^  Topic  ^  Reading  ^ 
-|  Jan 04   ✘  | Overview of the course and Performance +|  Jan 03   ✘  | Overview of the course and Performance  | Sections 1.1-1.6  | 
-|  Jan 11   ✘  | Data Translation +|  Jan 10   ✘  | Data Translation  | dataTrEx.pdf  | 
-|  Jan 18   Lab A  | Code Translation +|  Jan 17   Lab A  | Code Translation  | Sections 2.1-2.6  | 
-|  Jan 25   Lab B  | Translating Utility Classes -- The Stack | +|  Jan 24   Lab B  | Translating Utility Classes -- The Stack | Sections 2.7-2.9, 2.12, and 3.2  
-|  Feb 01   Lab C  | Translating Objects -- The Heap | +|  Jan 31   Lab C  | Translating Objects -- The Heap | Sections 2.14-2.15 and the rest of Ch 2  
-|  Feb 08   Lab D  | Machine Language + Floating-Point  | +|  Feb 07   Lab D  | Machine Language Chapter 2  | 
-|  Feb 15  |  //Reading Week//  |+|  Feb 14   make-up  | Test #1 on Mon, Floating-Point Computing on Wed  | Pages 242-250, 259-266 
-|  Feb 22   make-up  | [[https://wiki.cse.yorku.ca/course_archive/2009-10/W/2021/calendar|Test #1]] on Mon, Introduction to Hardware on Wed  | +^ ^^^^ 
-|  Mar 01   Lab K  | The CPU Datapath  | +|  Feb 28   Lab K  | Intro to Hardware  | See Hardware.pdf in the hw directory  | 
-|  Mar 08   Lab L  | The Single-Cycle Control +|  Mar 07   Lab L  | The Single-Cycle Datapath and Control  | Section 4.1-4.4  | 
-|  Mar 15   Lab M  | Pipelining +|  Mar 14   Lab M  | Pipelining  | Sections 4.5-4.8  | 
-|  Mar 22   Lab N  | Caches  | +|  Mar 21   Lab N  | Pipelining, cont.  | Sections 4.5-4.8  | 
-|  Mar 29   make-up Review  |+|  Mar 28   make-up Caches  Sections 4.10, 5.1-5.3 
 +|  Apr 04  |  ✘  | Caches, cont.  |   | 
 +^ ^^^^
  
 **Important Dates** **Important Dates**
-  * Test #1 is Mon Feb 22 in TBA+  * Test #1 is Mon Feb 14 in <hi>TEL 0001</hi>
-  * The Drop Deadline is Mon Mar 8.  +  * The Drop Deadline is Fri Mar 4.  
-  * Test #2 will be held during the exam period (Apr - 23).+  * Test #2 will be held during the exam period (Apr - 23).
calendar.1266083301.txt.gz · Last modified: 2010/02/13 17:48 by roumani

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki