start
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
start [2011/10/24 20:23] – jonathan | start [2012/01/09 18:45] (current) – jonathan | ||
---|---|---|---|
Line 10: | Line 10: | ||
10% - Requirements Document + Presentation (due Nov 30) | 10% - Requirements Document + Presentation (due Nov 30) | ||
- | 10% - Design Document + Presentation | + | 15% - Prototype code (some core functionality) |
- | 15% - Prototype code (some core functionality) | + | 10% - Design Document + Presentation |
10% - Testing Document + Presentation (due Feb 28) | 10% - Testing Document + Presentation (due Feb 28) | ||
Line 18: | Line 18: | ||
20% - Evaluation of final code (due Apr 2) | 20% - Evaluation of final code (due Apr 2) | ||
- | 25% - Final version of all three documents (due Apr 2) | + | 25% - Final version of all three documents. User manual and deployment information. |
10% - Final presentation (due Apr 2) | 10% - Final presentation (due Apr 2) | ||
Line 35: | Line 35: | ||
* 24 October 2011. Present detailed scenarios using realistic data of interactions between departmental advisors, faculty coordinator, | * 24 October 2011. Present detailed scenarios using realistic data of interactions between departmental advisors, faculty coordinator, | ||
* Nov 7th 2011. Present mathematical model of conflicts. Precise details of input including scheduling constraints and fields required from RO databases. | * Nov 7th 2011. Present mathematical model of conflicts. Precise details of input including scheduling constraints and fields required from RO databases. | ||
- | * 14 November 2011. Initial version | + | * 14 November 2011. Present revised mathematical model of conflicts. |
* 28 November 2011 | * 28 November 2011 | ||
- | * 19 December 2011 | + | * December |
+ | * 20 December 2011: 3.30pm. Present revised RD. | ||
+ | * Monday Jan 9, 12.30pm to 2pm. Revised RD and initial design | ||
+ | * Monday Jan 23, 12.30pm. Add complete tests to the requirements document. Prototype code e.g. displaying data from Excel file, | ||
+ | * Monday Jan 30, 12.30pm. Prototype core functionality including reading in Excel file, displaying it, selecting subsets of meets and displaying conflicts. | ||
===== Resources===== | ===== Resources===== |
start.1319487789.txt.gz · Last modified: 2011/10/24 20:23 by jonathan