start
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
start [2012/01/09 18:26] – jonathan | start [2012/02/06 20:47] (current) – jonathan | ||
---|---|---|---|
Line 12: | Line 12: | ||
15% - Prototype code (some core functionality) (due Jan 31) | 15% - Prototype code (some core functionality) (due Jan 31) | ||
- | 10% - Design Document + Presentation (due Feb 14) | + | 10% - Design Document + Presentation (due mid reading week) |
10% - Testing Document + Presentation (due Feb 28) | 10% - Testing Document + Presentation (due Feb 28) | ||
Line 18: | Line 18: | ||
20% - Evaluation of final code (due Apr 2) | 20% - Evaluation of final code (due Apr 2) | ||
- | 25% - Final version of all three documents (due Apr 2) | + | 25% - Final version of all three documents. User manual and deployment information. |
10% - Final presentation (due Apr 2) | 10% - Final presentation (due Apr 2) | ||
Line 27: | Line 27: | ||
===== Meetings ===== | ===== Meetings ===== | ||
- | |||
- | All meetings are 3:30 - 5:00 | ||
* 14 September 2011: Kickoff meeting | * 14 September 2011: Kickoff meeting | ||
Line 40: | Line 38: | ||
* 20 December 2011: 3.30pm. Present revised RD. | * 20 December 2011: 3.30pm. Present revised RD. | ||
* Monday Jan 9, 12.30pm to 2pm. Revised RD and initial design | * Monday Jan 9, 12.30pm to 2pm. Revised RD and initial design | ||
- | * Monday Jan 23, 12.30pm. Add complete tests to the requirements document. Prototype displaying data from Excel file, | + | * Monday Jan 23, 12.30pm. Add complete tests to the requirements document. Prototype |
- | * Monday Jan 30, 12.30pm. Prototype core functionality including | + | * Monday Jan 30, 1pm. Prototype core functionality including |
+ | * Monday Feb 6. 12.30pm. (a) GUI up and running sufficient to demo to customer. (b) Scenarios to put to users, especially concurrent updates and role of admin. | ||
+ | | ||
+ | *To Dos: Gaps, Users/ | ||
+ | |||
+ | ===== Testing (TA)===== | ||
+ | |||
+ | **(15%) Tuesday Feb 14 Code prototype test**. Student team will have the code to be tested installed on the server and meet with the TA for a block of time. TA will test the prototype. Run all functional tests from RD. Add new functional tests to check corner cases. Try out various scenarios on the actual code with the intention of crashing the system. Inspect code to search for problems. | ||
===== Resources===== | ===== Resources===== |
start.1326133605.txt.gz · Last modified: 2012/01/09 18:26 by jonathan