User Tools

Site Tools


grades

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
grades [2012/11/18 01:03] jonathangrades [2012/11/26 02:13] (current) jonathan
Line 25: Line 25:
   *A4: 4% (TTM Bridge Controller). Due date: Friday November 16, 11am (sharp)   *A4: 4% (TTM Bridge Controller). Due date: Friday November 16, 11am (sharp)
   *A5: 6% (TTM Alarm System)    *A5: 6% (TTM Alarm System) 
 +    * **Due date**: 11am, Dec. 5, 2011. (Can be submitted up to 11am on Dec 10 without penalty).
   *Project: 25% total, broken down into 5% and 20%. Team of 2 members.   *Project: 25% total, broken down into 5% and 20%. Team of 2 members.
     * **Due date Phase 1** (5%): Monday Nov. 19, 2012, 11am (sharp)     * **Due date Phase 1** (5%): Monday Nov. 19, 2012, 11am (sharp)
-    * **Due date Phase 2** (20%): Wednesday Nov 28, 2012 11am (sharp)+    * **Due date Phase 2** (20%): Monday, Dec. 3, 2012 11am (sharp)
   *Exam: 45%   *Exam: 45%
  
grades.1353200626.txt.gz · Last modified: 2012/11/18 01:03 by jonathan

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki