grades
Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revision | |||
| grades [2012/11/23 16:28] – jonathan | grades [2012/11/26 02:13] (current) – jonathan | ||
|---|---|---|---|
| Line 25: | Line 25: | ||
| *A4: 4% (TTM Bridge Controller). Due date: Friday November 16, 11am (sharp) | *A4: 4% (TTM Bridge Controller). Due date: Friday November 16, 11am (sharp) | ||
| *A5: 6% (TTM Alarm System) | *A5: 6% (TTM Alarm System) | ||
| + | * **Due date**: 11am, Dec. 5, 2011. (Can be submitted up to 11am on Dec 10 without penalty). | ||
| *Project: 25% total, broken down into 5% and 20%. Team of 2 members. | *Project: 25% total, broken down into 5% and 20%. Team of 2 members. | ||
| * **Due date Phase 1** (5%): Monday Nov. 19, 2012, 11am (sharp) | * **Due date Phase 1** (5%): Monday Nov. 19, 2012, 11am (sharp) | ||
grades.1353688094.txt.gz · Last modified: by jonathan
