start
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
start [2012/08/28 18:05] – jonathan | start [2012/12/14 03:11] (current) – jonathan | ||
---|---|---|---|
Line 10: | Line 10: | ||
* Tuesdays & Thursdays 4pm-5.30pm in CB122 | * Tuesdays & Thursdays 4pm-5.30pm in CB122 | ||
+ | * Guest lectures on UML by Dr. Jackie Wang, on Tuesdays Sep. 18, Sep. 25 and Oct. 2nd. | ||
Line 21: | Line 22: | ||
* Formulate Acceptance Tests and Traceability matrices for showing that the implemented software product satisfies the User Requirements Document | * Formulate Acceptance Tests and Traceability matrices for showing that the implemented software product satisfies the User Requirements Document | ||
* Models: use some modelling methods and tools for requirements analysis including | * Models: use some modelling methods and tools for requirements analysis including | ||
- | ** informal | + | * Informal |
- | ** mathematically | + | * Mathematically |
A work-intensive project will allow students to apply their knowledge to a non-trivial example. | A work-intensive project will allow students to apply their knowledge to a non-trivial example. | ||
In addition | In addition | ||
- | * you will be a temporal logic model checker | + | * you will be using a temporal logic model checker |
* You will also need to know some of the UML diagrams (you may want to read UML distilled : a brief guide to the standard object, Martin Fowler, available from Steacie). | * You will also need to know some of the UML diagrams (you may want to read UML distilled : a brief guide to the standard object, Martin Fowler, available from Steacie). | ||
start.1346177104.txt.gz · Last modified: 2012/08/28 18:05 by jonathan