User Tools

Site Tools


important_dates

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Next revision
Previous revision
important_dates [2007/07/31 17:53] – external edit 127.0.0.1important_dates [2013/01/07 19:51] (current) bil
Line 1: Line 1:
 ====== Important Dates ====== ====== Important Dates ======
  
-Here, you would list important dates for your course+  * **Every Wednesday** (except for those listed below) at 12:30 - 1:30: Each team will have a half hour slot to consult with the instructor
- +  * **March 6**: Each team will have a half hour slot to present the current version of their system to the instructor. 
-  * Sept 1 - Assignment 1 Due +  * **March 15**: Drop date. 
-  * Oct 1 - Course finished+  * **April 3**: Each team will have an 1-hour slot to present their system, as well as the content of their requirements, design, testing, and user manual documents. Feedback received during the presentation can still be incorporated in the final deliverables. 
 +  * **April 8**: All final deliverables are due.
  
  
  
important_dates.1185904404.txt.gz · Last modified: 2013/01/07 19:50 (external edit)

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki