User Tools

Site Tools


labs

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
labs [2013/11/21 20:57] peterlianlabs [2013/12/14 23:24] (current) peterlian
Line 3: Line 3:
 Lab starts on week 5, i.e. Oct. 11, 2013 Lab starts on week 5, i.e. Oct. 11, 2013
  
-A basic tutorial for Matlab {{:matlab-primer.pdf|Matlab Primer}} +A basic tutorial for Matlab  
-Please read the guideline for {{:labformatv2.pdf|lab report writing}} before you write the lab report.+Please read the guideline for lab report writing before you write the lab report.
  
  
-  - Lab Project 1 Introduction to Signal and Spectra {{:project1_f2013.pdf|project 1}}+  - Lab Project 1 Introduction to Signal and Spectra 
       * Lab report due on Oct 21, 2013.       * Lab report due on Oct 21, 2013.
  
-  - Lab Project 2 Baseband Transmission on Nov. 8, 2013 {{:project2_fall2013.pdf|project 2}}+  - Lab Project 2 Baseband Transmission on Nov. 8, 2013 
       * Lab report due on Nov. 15, 2013       * Lab report due on Nov. 15, 2013
  
-  - Lab Project 3 Matched Filtering on Nov. 15, 2013 {{:project3_fall2013.pdf|project 3}}+  - Lab Project 3 Matched Filtering on Nov. 15, 2013 
       * Lab report due on Nov. 25, 2013       * Lab report due on Nov. 25, 2013
  
-  - Lab Project 4 Phase Shift Keying on Nov. 22, 2013{{:project4_fall2013.pdf|project 4}}+  - Lab Project 4 Phase Shift Keying on Nov. 22, 2013
   * Lab report due on Dec 2, 2013   * Lab report due on Dec 2, 2013
  
labs.txt · Last modified: 2013/12/14 23:24 by peterlian

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki