lab
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
lab [2014/09/29 20:18] – aboelaze | lab [2014/10/31 21:02] (current) – aboelaze | ||
---|---|---|---|
Line 20: | Line 20: | ||
San Jose, CA | San Jose, CA | ||
- | veriwell (verilog simulator) {{: | + | veriwell (verilog simulator) {{: |
+ | * {{: | ||
+ | The above files contains addi and or which you were asked to implelemnt, here is the new input file {{: | ||
+ | |||
+ | **How to submit**: first do man submit. C files should be submitted to a1c and java files to a1j. C file **MUST** be named ProjectMips.c and the main class in java **MUST** be called ProjectMips.java. **The deadline is Tuesday Nov 4 midnight** | ||
+ | |||
+ | <fc red> I have been asked by many students on when the report is due, | ||
+ | |||
+ | This is a 2 lab sessions project, meaning in the second lab session (either oct. 14 or Oct 20, dedpending on your section), you should complete the project (no demo though). Then at the beginning of the following lab (Oct 21, or Oct 27) you submit the report </fc> | ||
+ | |||
+ | * {{: | ||
+ | * {{: | ||
+ | * {{: | ||
+ | *{{: | ||
lab.1412021886.txt.gz · Last modified: 2014/09/29 20:18 by aboelaze