User Tools

Site Tools


eval

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Next revision
Previous revision
eval [2013/01/07 19:43] – created bileval [2015/01/06 21:04] (current) bil
Line 1: Line 1:
 ===== Evaluation===== ===== Evaluation=====
  
-15% - Midterm prototype + Presentation (due Mar 6)+The following rubric explains how project submissions will be marked:
  
-10% Requirements Document (due Apr 8)+{{:cse2311-projectrubric.xlsx|Project rubric}}
  
-10% - Design Document (due Apr 8)  +To receive a mark, each member of the team must email the instructor with an evaluation of the contributions of the team members to the project. This can be as short as "All members contributed equally" or as long as necessary.
- +
-10% - Testing Document (due Apr 8) +
- +
-5%  - User Manual (due Apr 8) +
- +
-20% - Evaluation of final code (due Apr 8) +
- +
-20% - Final presentation (due Apr 3) +
- +
-10% - Participation (in class and at weekly presentations) +
- +
-Note: By April 8, each member of the team must email the instructor with an evaluation of the contributions of the team members to the project. This can be as short as "All members contributed equally" or as long as necessary.+
  
 It is expected that each member will contribute to each deliverable in a substantial manner. It is expected that each member will contribute to each deliverable in a substantial manner.
  
eval.1357587823.txt.gz · Last modified: 2013/01/07 19:43 by bil