User Tools

Site Tools


important_dates

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
important_dates [2015/01/06 20:58] bilimportant_dates [2015/03/20 17:17] (current) bil
Line 1: Line 1:
 ====== Important Dates ====== ====== Important Dates ======
  
-  * **Every Wednesday** (except for those listed below) at 12:10 - 1:30: Each team will have a 20 minute slot to consult with the instructor.+  * **Every Wednesday** (except for those listed below) at 12:10 - 1:30: Each team will have a 20 minute slot to consult with the instructor. These meetings will take place in LAS 2002.
   * **February 25**: Each team will have a half hour slot to present their prototype to the instructor.   * **February 25**: Each team will have a half hour slot to present their prototype to the instructor.
   * **March 6**: Drop date.   * **March 6**: Drop date.
-  * **April 1**: Each team will have a half hour slot to present their system, as well as the content of their requirements, design, testing, and user manual documents. Feedback received during the presentation can still be incorporated in the final deliverables. +  * **April 8**: Each team will have a half hour slot to present their system, as well as the content of their requirements, design, testing, and user manual documents. Feedback received during the presentation can still be incorporated in the final deliverables. 
-  * **April 6**: All final deliverables are due.+  * **April 17**: All final deliverables are due.
  
  
  
important_dates.txt · Last modified: 2015/03/20 17:17 by bil