start
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
start [2014/03/13 17:09] – bil | start [2015/04/27 18:30] (current) – bil | ||
---|---|---|---|
Line 1: | Line 1: | ||
- | ====== Software Engineering Testing | + | ====== Software Engineering Testing |
- | ===== Announcement | + | ===== Announcements |
+ | |||
+ | **January 12, 2015**: Assignment 1 has been posted. | ||
+ | |||
+ | **January 26, 2015**: [[http:// | ||
+ | |||
+ | **February 2, 2015**: Assignment 2 has been posted. | ||
+ | |||
+ | **February 9, 2015**: Assignment 1 feedback has been sent to your cse email. You can see your grade on ePost (link on sidebar). | ||
+ | |||
+ | **February 23, 2015**: Assignment 3 has been posted. | ||
+ | |||
+ | **March 2, 2015**: Assignment 2 feedback has been sent to your cse email. You can see your grade on ePost (link on sidebar). | ||
+ | |||
+ | **March 17, 2015**: Assignment 4 has been posted. | ||
+ | |||
+ | **March 27, 2015**: Assignment 3 feedback has been sent to your cse email. You can see your grade on ePost (link on sidebar). | ||
+ | |||
+ | **April 27, 2015**: Assignment 4 feedback has been sent to your cse email. You can see your grade on ePost (link on sidebar). Overall course grades are on ePost as well. | ||
- | ** | ||
- | Instructor evaluations will take place at the beginning of lecture on Wed, March 19. | ||
- | ** | ||
===== Description | ===== Description | ||
Line 12: | Line 27: | ||
The course introduces systematic methods of testing and verifying various types of software systems covering a range of static and dynamic techniques and their use within the development process. All too often software is designed and then tested. The real aim must be to take a more holistic view, where design is carried out with verification in mind to achieve overall project goals. | The course introduces systematic methods of testing and verifying various types of software systems covering a range of static and dynamic techniques and their use within the development process. All too often software is designed and then tested. The real aim must be to take a more holistic view, where design is carried out with verification in mind to achieve overall project goals. | ||
- | Upon successful completion of the course | + | Upon successful completion of the course, students |
- | * Understand | + | * Outline |
- | * Understand | + | * Describe |
- | * Be able to select appropropriate | + | * Select appropriate testing |
- | * Be able to produce | + | * Develop |
- | * Be able to produce | + | * Submit issue reports that are clear and complete. |
+ | * Produce | ||
===== Lectures ===== | ===== Lectures ===== | ||
- | * Mondays | + | * Mondays |
- | * Wednesdays | + | * Wednesdays |
start.1394730567.txt.gz · Last modified: 2014/03/13 17:09 by bil