| **Course**: | **Course**: | ||
| - | **Academic Year**: | + | **Academic Year**: |
| **Project title**: | **Project title**: | ||
| Line 50: | Line 50: | ||
| === Milestones List === | === Milestones List === | ||
| - | // | + | // |
| + | The following is an example: | ||
| - by < | - by < | ||
| Line 65: | Line 66: | ||
| At least 20% of the evaluation should be available before the drop date. | At least 20% of the evaluation should be available before the drop date. | ||
| - | The following is an example. Note that all projects must have a requirement for a poster preparation and presentation. The grading of this requirement is worth 30% of the final grade and is assigned by the CSE4080 | + | The following is an example. Note that all projects must have a requirement for a poster preparation and presentation. The grading of this requirement is worth 30% of the final grade and is assigned by the EECS4080 |
| * Mid-project status report -- ?% | * Mid-project status report -- ?% | ||
| Line 73: | Line 74: | ||
| * Programming and technical work -- ?% | * Programming and technical work -- ?% | ||
| - | * Poster presentation -- 30% (required component) | + | * Poster |
| * Meeting milestones -- ?% | * Meeting milestones -- ?% | ||