====== Contract Template ====== | ====== Contract Template ====== | ||
- | A contract is typically | + | The project |
- | **Course**: | + | **Course**: |
- | **Academic Year**: | + | **Academic Year**: |
**Project title**: | **Project title**: | ||
Line 22: | Line 22: | ||
What the project is to achieve, a half to one page. Please describe the educational component of the project. | What the project is to achieve, a half to one page. Please describe the educational component of the project. | ||
- | === Requirements === | + | === Background |
Prerequisite courses: list the courses and the minimum-mark requirement for each | Prerequisite courses: list the courses and the minimum-mark requirement for each | ||
Line 33: | Line 33: | ||
=== Resources === | === Resources === | ||
- | This is worth spelling | + | These should be spelled |
Software: | Software: | ||
Line 46: | Line 46: | ||
=== Deliverables === | === Deliverables === | ||
- | List of artifacts to be completed by the final due date; includes programs, documentation, | + | List of //artifacts// to be completed by the final due date; includes programs, documentation, |
=== Milestones List === | === Milestones List === | ||
- | Milestones to be reached during the project. Useful for the project contract and progress evaluation. The following is an example: | + | //Milestones// to be reached during the project. Useful for the project contract and progress evaluation. The following is an example: |
- by < | - by < | ||
Line 61: | Line 61: | ||
=== Evaluation === | === Evaluation === | ||
- | Some indication | + | Indication |
At least 20% of the evaluation should be available before the drop date. | At least 20% of the evaluation should be available before the drop date. | ||
- | The following is an example. Note that all projects must have a requirement for a poster preparation and presentation. The grading of this requirement is worth 30% of the final grade and is assigned by the CSE4080 | + | The following is an example. Note that all projects must have a requirement for a poster preparation and presentation. The grading of this requirement is worth 30% of the final grade and is assigned by the EECS4080 |
* Mid-project status report -- ?% | * Mid-project status report -- ?% | ||
Line 73: | Line 73: | ||
* Programming and technical work -- ?% | * Programming and technical work -- ?% | ||
- | * Poster presentation -- 30% | + | * Poster |
* Meeting milestones -- ?% | * Meeting milestones -- ?% |