contract
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
contract [2011/08/23 20:36] – dymond | contract [2017/04/08 16:32] (current) – roumani | ||
---|---|---|---|
Line 1: | Line 1: | ||
====== Contract Template ====== | ====== Contract Template ====== | ||
- | A contract is typically | + | The project |
- | **Course**: | + | **Course**: |
- | **Academic Year**: | + | **Academic Year**: |
**Project title**: | **Project title**: | ||
Line 46: | Line 46: | ||
=== Deliverables === | === Deliverables === | ||
- | List of // | + | List of // |
=== Milestones List === | === Milestones List === | ||
Line 65: | Line 65: | ||
At least 20% of the evaluation should be available before the drop date. | At least 20% of the evaluation should be available before the drop date. | ||
- | The following is an example. Note that all projects must have a requirement for a poster preparation and presentation. The grading of this requirement is worth 30% of the final grade and is assigned by the CSE4080 | + | The following is an example. Note that all projects must have a requirement for a poster preparation and presentation. The grading of this requirement is worth 30% of the final grade and is assigned by the EECS4080 |
* Mid-project status report -- ?% | * Mid-project status report -- ?% | ||
Line 73: | Line 73: | ||
* Programming and technical work -- ?% | * Programming and technical work -- ?% | ||
- | * Poster presentation -- 30% (required component) | + | * Poster |
* Meeting milestones -- ?% | * Meeting milestones -- ?% |
contract.1314131810.txt.gz · Last modified: 2011/08/23 20:36 by dymond