calendar
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
calendar [2019/03/05 05:09] – nsajadi | calendar [2019/03/30 20:12] (current) – nsajadi | ||
---|---|---|---|
Line 7: | Line 7: | ||
| Jan 28 | Lab C | | Translating Utility Classes | Sections 2.8 and 2.9, [[https:// | | Jan 28 | Lab C | | Translating Utility Classes | Sections 2.8 and 2.9, [[https:// | ||
| Feb 04 | Lab D | Q1 |Translating Objects -- The Heap | Chapter 2 - the rest of Chapter 2, | | Feb 04 | Lab D | Q1 |Translating Objects -- The Heap | Chapter 2 - the rest of Chapter 2, | ||
- | | Feb 11 | ✘ (Snow Cancellation) | |Floating-Point Computing | Sections | + | | Feb 11 | ✘(Snow Cancellation) | |Floating-Point Computing | Sections |
^ ^^^^^ | ^ ^^^^^ | ||
- | | Feb 25 | make-up |Midterm | | | | + | | Feb 25 | make-up |
- | | Mar 04 | Lab K | |The Single-Cycle Datapath | + | | Mar 04 | Lab K | |The Single-Cycle Datapath | Section 3.5, 4.1-4.3 [[https:// |
- | | Mar 11 | Lab L | Q2 |Pipelining | + | | Mar 11 | Lab L | Q2 |Control |
- | | Mar 18 | Lab M | |Pipelining, cont. | + | | Mar 18 | Lab M | |Pipelining |
- | | Mar 25 | Lab N | |Caches | + | | Mar 25 | Lab N | |Hazards and Parallelism via Instructions |
- | | Apr 01 | make-up | + | | Apr 01 | make-up |
^ ^^^^^ | ^ ^^^^^ | ||
Line 21: | Line 21: | ||
* Midterm is on Mon Feb 25 in < | * Midterm is on Mon Feb 25 in < | ||
* The Drop Deadline is on Fri Mar 8. | * The Drop Deadline is on Fri Mar 8. | ||
- | * Final will be held between | + | * <hi> The final exam will be held on Apr. 7, from 7:00PM to 10:00PM, Location: DB 0014, DB 0016 , Dahdaleh Building (formerly TEL)</ |
calendar.1551762580.txt.gz · Last modified: 2019/03/05 05:09 by nsajadi