faq
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revisionLast revisionBoth sides next revision | ||
faq [2015/11/04 01:50] – jxu | faq [2019/09/03 15:40] – jxu | ||
---|---|---|---|
Line 58: | Line 58: | ||
You are allowed to modify the main() procedure and the alarm_thread in any way that meets the assignment requirements. | You are allowed to modify the main() procedure and the alarm_thread in any way that meets the assignment requirements. | ||
+ | **Question 5**: Some members of my assignment group are doing less work / making less | ||
+ | effort / contributing less. Is this a valid reason for not handing in the assignment before the due date? | ||
+ | Answer to Question 5: | ||
+ | |||
+ | Unfortunately a claim that some members of an assignment group | ||
+ | are doing less work / making less | ||
+ | effort / contributing less than some other members of the assignment | ||
+ | group, is NOT a valid reason for not handing in | ||
+ | an assignment on or before the assignment due date. | ||
+ | |||
+ | If any member of any assignment group wishes to receive any credit | ||
+ | for any assignment, | ||
+ | that assignment group would need to hand in the assignment | ||
+ | on or before the assignment due date. |
faq.txt · Last modified: 2019/11/07 00:04 by jxu