January 26: First draft of Requirements Document must be submitted.
February 2: Peer feedback on the above is due.
February 9: System prototype and User Manual must be submitted.
February 16: Peer feedback on the above is due.
February 23: Midterm submission is due.
March 8: System prototype and User Manual must be submitted.
March 15: Peer feedback on the above is due.
March 22: Draft of Design Document must be submitted.
March 29: Peer feedback on the above is due.
April 6: Final submission is due.
All deadlines are at 11:55pm.