start
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
start [2020/04/13 16:08] – jonathan | start [2020/04/13 16:13] (current) – jonathan | ||
---|---|---|---|
Line 7: | Line 7: | ||
- | ===== Description | + | ====== Description |
Large-scale project involving all stages of the software development life cycle: requirements, | Large-scale project involving all stages of the software development life cycle: requirements, | ||
Line 45: | Line 45: | ||
+ | **By the end of first term Dec. 20th**: | ||
+ | * (10%): An initial requirements document. The Team must provide a technically complete and literate requirements document written to professional standards. | ||
+ | * (5%): An oral slide presentation to the Instructor of the preliminary design and documentation. Each team member must present an aspect of the whole design. | ||
- | | + | **By the end of the second term April 30:** |
- | | + | * (10%): The final requirements documents |
- | By the end of the second term April 25: | + | * (40%): Proof of usability and correctness of the actual product via acceptance testing and a Test document. |
- | * (10%) The final requirements documents | + | * (25%): |
- | * ((40%) Proof of usability and correctness of the actual product via acceptance testing and a Test document. | + | * (5%): Final slide presentation |
- | * A professional Design Document | + | * (5%): Team self-assessment of each other. |
- | * ( (5%) Final slide presentation | + | |
- | * ( (5%) Team self-assessment of each other. | + | |
+ | Regular weekly or biweekly meetings will be held with with the Project Supervisor. | ||
start.1586794105.txt.gz · Last modified: 2020/04/13 16:08 by jonathan