- | ===== Description | + | ====== Description |
Large-scale project involving all stages of the software development life cycle: requirements, | Large-scale project involving all stages of the software development life cycle: requirements, | ||
Line 50: | Line 50: | ||
**By the end of the second term April 30:** | **By the end of the second term April 30:** | ||
- | * (10%): The final requirements documents | + | * (10%): The final requirements documents |
* (40%): Proof of usability and correctness of the actual product via acceptance testing and a Test document. | * (40%): Proof of usability and correctness of the actual product via acceptance testing and a Test document. | ||
- | * A professional Design Document | + | * (25%): |
- | * (5%): Final slide presentation | + | * (5%): Final slide presentation |
* (5%): Team self-assessment of each other. | * (5%): Team self-assessment of each other. | ||
+ | Regular weekly or biweekly meetings will be held with with the Project Supervisor. | ||