 Large-scale project involving all stages of the software development life cycle: requirements, analysis and design, implementation, testing and delivery. Team work. Open only to students in the Software Development Stream. Prerequisites: LE/EECS 3311 3.00 (with minimum grade of B), LE/EECS 3101 3.00, LE/EECS 3342 3.00. Corequisites: LE/EECS 4312 3.00, LE/EECS 4313 3.00.   Large-scale project involving all stages of the software development life cycle: requirements, analysis and design, implementation, testing and delivery. Team work. Open only to students in the Software Development Stream. Prerequisites: LE/EECS 3311 3.00 (with minimum grade of B), LE/EECS 3101 3.00, LE/EECS 3342 3.00. Corequisites: LE/EECS 4312 3.00, LE/EECS 4313 3.00.  
Line 52: Line 52:
   * (10%): The final requirements documents    * (10%): The final requirements documents 
   * (40%): Proof of usability and correctness of the actual product via acceptance testing and a Test document.   * (40%): Proof of usability and correctness of the actual product via acceptance testing and a Test document.
-  * A professional Design Document +  * (25%): A professional Design Document 
-  * (5%): Final slide presentation+  * (5%): Final slide presentation (this is organized by the course coordinator for EECS4080)
   * (5%): Team self-assessment of each other.   * (5%): Team self-assessment of each other.
  
 +Regular weekly or biweekly meetings will be held with with the Project Supervisor.
  