start
Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| start [2020/04/13 16:10] – jonathan | start [2020/04/13 16:13] (current) – jonathan | ||
|---|---|---|---|
| Line 7: | Line 7: | ||
| - | ===== Description | + | ====== Description |
| Large-scale project involving all stages of the software development life cycle: requirements, | Large-scale project involving all stages of the software development life cycle: requirements, | ||
| Line 52: | Line 52: | ||
| * (10%): The final requirements documents | * (10%): The final requirements documents | ||
| * (40%): Proof of usability and correctness of the actual product via acceptance testing and a Test document. | * (40%): Proof of usability and correctness of the actual product via acceptance testing and a Test document. | ||
| - | * A professional Design Document | + | * (25%): |
| - | * (5%): Final slide presentation | + | * (5%): Final slide presentation |
| * (5%): Team self-assessment of each other. | * (5%): Team self-assessment of each other. | ||
| + | Regular weekly or biweekly meetings will be held with with the Project Supervisor. | ||
start.1586794212.txt.gz · Last modified: by jonathan