The project contract is typically about three pages in length. It is prepared by the student with required input from their faculty project supervisor. It has the following layout:
Course: EECS4080 or 4480
Term: Summer 2021 Project title: < title >
Supervisor name (email): < name > (< email >)
Student name: < name >
Student number: 123456789
Student's email: < email >
What the project is to achieve, described in a half to one page. Please describe the educational component of the project.
Prerequisite courses: list the courses and the minimum-mark requirement for each
Corequisite courses: list the courses to be taken concurrently
Other experience: technical know-how needed, familiarity with languages and systems, mathematical background, etc.
These should be spelled out because they may be more helpful to the student in choosing a project than the project description.
Software: list of programming languages, tools, operating systems, etc.
Hardware: list of computer and other needed devices.
A short list of research papers/books that could/must be studied or referenced for the project, that can help give some idea of what the project is about and the background required.
List of artifacts to be completed by the final due date; includes programs, documentation, reports, user guides, etc. One of them is your final project poster presentation on a date around the end of term.
Milestones to be reached during the project. Useful for the project contract and progress evaluation. Some formal evaluation should be provided to the student before the drop date. The following is an example:
Indication as to how the project will be evaluated. For example, the project can be marked on the basis of the progress towards stated goals, and the clarity and completeness of programs, documentation and reports. It is strongly recommended and encouraged that evaluation has a number of components and not just a grade at the end. Grades can be associated with different deliverables or their parts. Components could include: documentation, programming style, quality of the interface design, project proposal presentation, project status presentations, and overall evaluation.
At least 20% of the evaluation should be available before the drop date.
The following is an example. Note that all projects must have a requirement for a poster preparation and presentation. The grading of this requirement is worth 30% of the final grade and is assigned by the EECS4080 seminar committee. By signing this contract both student and supervisor agree to participate in the seminar day which will be typically scheduled during the exam period or in the first week of class following the term that student is enrolled in EECS4080. Students and supervisors should check the course web page for the current term to find the date scheduled for the seminars.
Student
Supervisor
Course Coordinator