User Tools

Site Tools


important_dates

This is an old revision of the document!


Important Dates

  • Every Wednesday (except for those listed below) at 12:30 - 1:30: Each team will have a half hour slot to consult with the instructor.
  • March 6: Each team will have a half hour slot to present the current version of their system to the instructor.
  • March 15: Drop date.
  • April 3: Each team will have an 1-hour slot to present their system, as well as the content of their requirements, design, testing, and user manual documents. Feedback received during the presentation can still be incorporated in the final deliverables.
  • April 8: All final deliverables are due.
important_dates.1357588266.txt.gz · Last modified: 2013/01/07 19:51 by bil