To be posted.
-->
- January 26: First draft of Requirements Document must be submitted.
- February 2: Peer feedback on the above is due.
- February 9: System prototype and User Manual must be submitted.
- February 16: Peer feedback on the above is due.
- February 23: Midterm submission is due.
- March 8: First draft of Design Document must be submitted.
- March 15: Peer feedback on the above is due.
- March 22: System prototype and User Manual must be submitted.
- March 29: Peer feedback on the above is due.
- April 6: Final submission is due.
All deadlines are at 11:55pm.