To be posted.
-->
- January 31: First draft of Requirements Document must be submitted.
- February 7: Peer feedback on the above is due.
- February 14: System prototype and User Manual must be submitted.
- February 21: Peer feedback on the above is due.
- February 28: Midterm submission is due.
- March 13: System prototype and User Manual must be submitted.
- March 20: Peer feedback on the above is due.
- March 27: Draft of Design Document must be submitted.
- April 4: Peer feedback on the above is due.
- April 13: Final submission is due.
All deadlines are at 11:59pm.