User Tools

Site Tools


whats_new

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
whats_new [2009/12/03 21:53] roumaniwhats_new [2009/12/18 15:58] (current) roumani
Line 4: Line 4:
  
 ---- ----
-**Thu Dec. 32009** +**Thu Dec. 1809** 
-  * LabTest#2 will be returned at the end of Monday's lectureNote that the lecture will cover Derby and it will be videotaped.+  * The project marks are now on ePost. The project was marked based on 6 factors: Road Test of B2C (20%), Road Test of B2B (8%), Design and Implementation (24%), Report (20%), Code and Team (8%), and Rank (20%)A letter grade is assigned to each and these grades are then combined. A project assessment, with detailed feedback on each of these factors, will be emailed to each team shortly. The overall course grades are also posted.
  
-The marks of LT#2 are on ePost. If you believe there are errors in the marking of your submission, email your professor indicating clearly where the errors are. The email will be reviewed with the marker and your mark will be reappraised, up or down, accordingly.+---- 
 +**Tue Dec. 8, 2009** 
 +  * No need to upload your war file for the project, just submit it electronically together with everything else. The paper report //is// still required. 
 + 
 +---- 
 +**Thu Dec. 3, 2009** 
 +  * LabTest#2 will be returned at the end of Monday's lecture. Note that the lecture will cover Derby and it will be videotaped. The marks of LT#2 are on ePost. If you believe there are errors in the marking of your submission, email your professor by Dec 14 indicating clearly where the errors are. The email will be reviewed with the marker and your mark will be reappraised, up or down, accordingly.
  
 ---- ----
whats_new.1259877184.txt.gz · Last modified: 2009/12/03 21:53 by roumani

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki