calendar
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
calendar [2014/02/26 21:33] – skhan | calendar [2014/04/02 13:59] (current) – skhan | ||
---|---|---|---|
Line 19: | Line 19: | ||
| Feb 24 | Make-up A-D | Midterm, Intro to Hardware | Sections B.1 to B.5 | Lec-8a: | | Feb 24 | Make-up A-D | Midterm, Intro to Hardware | Sections B.1 to B.5 | Lec-8a: | ||
| | | Combinational Circuits | | | | Combinational Circuits | ||
- | | Mar 03 | Lab K | The Single-Cycle Datapath and Control | + | | Mar 03 | Lab K | Performance |
- | | | + | | |
- | | Mar 10 | Lab L | Pipelining | + | | Mar 10 | Lab L | The S/C Datapath and Control |
- | | Mar 17 | Lab M | Pipelining, cont. | Sections 4.7-4.8 | Lec-11: | | + | | |
- | | Mar 24 | Lab N | Caches | + | | Mar 17 | Lab M | S/C Control, Pipelining |
- | | Mar 31 | Make-up K-N | Caches, cont. | Section 5.3 | Lec-13: | | + | | Mar 24 | Lab N | Pipelining, cont. | Sections |
+ | | Mar 31 | Make-up K-N | Caches | ||
+ | | | ||
^ ^^^^^ | ^ ^^^^^ | ||
calendar.1393450430.txt.gz · Last modified: 2014/02/26 21:33 by skhan