important_dates
Important Dates
<!--
To be posted.
-->
- February 2: First draft of Requirements Document must be submitted.
- February 9: Peer feedback on the above is due.
- February 20: System prototype and User Manual must be submitted.
- February 27: Peer feedback on the above is due.
- March 6: Midterm submission is due.
- March 16: System prototype and User Manual must be submitted.
- March 23: Peer feedback on the above is due.
- March 30: Draft of Design Document must be submitted.
- April 6: Peer feedback on the above is due.
- April 11: Final submission is due.
All deadlines are at 11:59pm.